Microsoft 70-652 exam measures your ability to accomplish the technical tasks listed in the following table. The percentages indicate the relative weight of each major topic area on the exam.
Skills measured by Exam 70-652
Installing Hyper-V (14 percent)
Configuring and Optimizing Hyper-V (20 percent)
Deploying Virtual Machines (30 percent)
Managing and Monitoring Virtual Machines (36 percent)
now can free download some Microsoft 70-652 Exam braindumps
1. You plan to test an application on a virtual machine that runs Windows Vista Service Pack 1 (SP1).
You plan to run multiple tests within the application. Each test modifies the settings of the application.
You install the application and maintain the default settings, and take a snapshot.
You need to start each test by using the default application settings.
What should you do after completing each test?
A. Reset the virtual machine.
B. Revert the virtual machine.
C. Restart the virtual machine.
D. Turn off and then turn on the virtual machine.
B
2. Your network contains a server that runs Microsoft System Center Virtual Machine Manager (SCVMM) 2008 and 10 servers that run Windows Server 2008 that have the Hyper-V server role installed.
You plan to move a virtual machine to another host server.
You need to move the virtual machine to the destination host that has the most available system resources. The destination host must be automatically selected by SCVMM.
What should you do?
A. Use the Clone virtual machine action.
B. Use the Export option in Hyper-V Manager.
C. Drag and drop the virtual machine on a new host.
D. Drag and drop the virtual machine on the All Hosts host group.
D
3. You have a server that runs Windows Server 2008. The server has the following software installed:
Default installation of the Web Server (IIS) server role
Microsoft System Center Virtual Machine Manager (SCVMM) 2008 server components
You start the Virtual Machine Manager (VMM) Self-Service Portal installation and receive an installation error message.
You need to ensure that you can install the VMM Self-Service Portal.
What should you do?
A. Install a Web server certificate.
B. Install additional Web Server (IIS) server role services.
C. Enable Windows Authentication in Microsoft Internet Information Service (IIS).
D. Configure the .NET trust level in Microsoft Internet Information Service (IIS) to medium.
B
1. What are the benefits of Capacity Analysis and Performance Optimization?(Select all that apply)
A. Capacity analysis helps define and gauge overall system health by establishing baseline performance values, and then the analysis provides valuable insight into where the system is heading.
B. Continuous performance monitoring and optimization will ensure systems are stable and perform well, reducing support calls from end users, which, in turn, reduces costs to the organization and helps employees be more productive.
C. Capacity analysis can be used to uncover both current and potential bottlenecks and can also reveal how changing management activities can affect performance today and tomorrow.
D. Capacity analysis can be applied to small environments and scale well into enterprise-level systems.
ABCD
2. Every Windows 2008 server has a common set of resources that can affect performance, reliability, stability, and availability. For this reason, it??s important that you monitor this common set of resources, then what are included in this common set of resources?(Select all that apply)
A. CPU
B. disk
C. memory
D. network utilization.
ABCD
3. You work as the network administrator at Pass4sure, Ltd. The company’s network consists of a server that runs Microsoft System Centre Virtual Machine Manager (SCVMM) 2008.
The company requires you to enable the Performance and Resource Optimization (PRO) feature on the SCVMM server.
Then what action should you perform first to meet the requirement?
A. You need to install the Failover Clustering feature.
B. You need to uninstall the Web Server (IIS) server role.
C. You need to deploy Microsoft Systems Centre Operations Manager (SCOM) 2007.
D. You need to deploy Microsoft System Center Configuration Manager (SCCM) 2007.
C
4. You work as the network administrator at Pass4sure, Ltd. The company’s network consists of two servers named Server1 and Server2. Both of them run Windows Server 2008 and have installed the Hyper-V server role.
Currently, you create a virtual machine that runs Windows Server 2008 on both servers. Each virtual machine hosts a copy of your company’s internal Website and the virtual machines are stored on local physical drives.
Base on the conditions, you are required to ensure that the internal Website is available if either the single host server or the virtual machine fails.
Then what should you configure to achieve the goal?
A. Failover Clustering on Server 1 and Server2
B. Failover Clustering on the virtual machines
C. Network Load Balancing on the virtual machines
D. Network Load Balancing on Server 1 and Server2
C
6. You work as the network administrator at Pass4sure, Ltd. The company assigns you a server that runs Windows Server 2008. The server has the following software installed: Default installation of the Web Server (IIS) server role; Microsoft System Center Virtual Machine Manager (SCVMM) 2008 server components.
Currently, you attempt to start the Virtual Machine Manager (VMM) Self-Service Portal installation but receive an installation error message.
Now, you must ensure that you can install the VMM Self-Service Portal.
Then what action should you perform to achieve the goal?
A. You need to install a Web server certificate.
B. You need to install additional Web Server (IIS) server role services.
C. You need to enable Windows Authentication in Microsoft Internet Information Service.
D. You need to configure the .NET trust level in Microsoft Internet Information Service to medium.
B
7. You work as the network administrator at Pass4sure, Ltd. The company’s network consists of two servers named Server1 and Server2. Both servers run Windows Server 2008. You have installed the Hyper-V server role on Server1 and the Windows Deployment Services role on Server2.
Currently, you have a virtual machine named VM1 that has a full installation of Windows Server 2008. VM1 uses a single Virtual Hard Disk (VHD) named VM1.vhd. You prepare VM1 for imaging.
Now, you are required to place an image of VM1 on Server2 so that it can be deployed to both physical and virtual hosts by using Windows Deployment Services.
Then which two actions should you perform to achieve the goal?
A. You need to configure VM1 to use a legacy network adapter.
B. You need to restart VM1 by using a Windows Deployment Services capture image.
C. You need to restart VM1 by using a Windows Deployment Services discover image.
D. You need to export VM1 and specify \\server2\D$\RemoteInstall\images as the destination.
AB
8. You work as the network administrator at Pass4sure, Ltd. The company’s network consists of a server that runs Windows Server 2008, and the server has the Hyper-V server role installed.
Now, you are required to ensure that a user named User1 can remotely connect to the Hyper-V server by using Hyper-V Manager.
Then what should you modify?
A. The Role Definitions in Authorization Manager
B. The Role Assignments in Authorization Manager
C. The members of the local Server Operators group
D. The NTFS permissions of the InitialStore.xml file
B
4. You create a virtual machine named VM1 that runs Windows Server 2008.
You plan to create new virtual machines that will use VM1s virtual disk as their parent disk.
You need to ensure that the new virtual machines automatically run the Mini-Setup Wizard the first time they start.
Which command should you run?
A. Shutdown /m \\VM1 /s /t 10
B. Sysprep /quiet /generalize /oobe /shutdown
C. Winnt32 /unattend:unattend.xml
D. winrm quickconfig
5. You have a server that runs Windows Server 2008. The server has the Hyper-V server role installed and the following configurations:
Physical hardware configuration
Dual core processor
20-GB RAM
Single port network card
Two SATA hard disks for the operating system (drive C) in a RAID 1 configuration
Four SATA hard disks for the virtual machine storage (drive D) in a RAID 10 configuration
Virtual machine configurations
Two virtual machines that each run at 10 percent CPU utilization
Each virtual machine uses 8 GB of RAM
Administrators report slow response times when they use Hyper-V Manager to establish remote connections to the Hyper-V server.
You need to improve response times when administrators use Hyper-V Manager.
What should you do?
A. Increase the RAM.
B. Add a second processor.
C. Add a second network card.
D. Change the SATA drives to iSCSI drives.
C
5. You work as the network administrator at Pass4sure, Ltd. The company’s network consists of a server that runs Microsoft System Center Virtual Machine Manager (SCVMM) 2008 and ten servers that run Windows Server 2008 that have installed the Hyper-V server role.
Currently, you are required to move a virtual machine to another host server.
So you must move the virtual machine to the destination host that has the most available system resources. The destination host must be automatically selected by System Center Virtual Machine Manager “SCVMM”.
Then what action should you perform to achieve the goal?
A. You need to use the Clone virtual machine action.
B. You need to use the Export option in Hyper-V Manager.
C. You need to drag and drop the virtual machine on a new host.
D. You need to drag and drop the virtual machine on the All Hosts host group.
D